Projekt
WtE San Sebastian

Steinmüller Babcock Environment, based in Gummersbach, is realising the construction of the new waste-to-energy power plant in San Sebastian, Spain.

 

Projekt
HKV Basel II

During the last 20 years, STAG has already supplied, on behalf of Industriellen Werke Basel (IWB), a number of conveying systems for the waste-to-energy plant and the wood-fired power plant integrated therein.

Projekt
WtE Stettin

The general contractor Rafako from Poland supplied for the first time a complete boiler and electric filter system for the waste-to-energy power plant in Stettin and therefore, opted for the expertise of STAG.

 

Projekt
Lignite Transhipment Brandenburg

At the site of Brandenburg, STAG has been entrusted by Rheinbraun Brennstoff GmbH to build a terminal serving for the transhipment of pulverised lignite from rail to road.

Projekt
Chemiepark EMS

Terephthalic acid is a free-flowing powder serving as base material in the fabrication of plastic granulate, and is supplied to the premises of EMS by tank rail wagons.

Projekt
HHKV Aarberg

In order to meet the heat demand of Schweizer Zucker AG at its Aarberg site in Switzerland, a biomass power plant has been constructed at the same location. Martin GmbH was charged to build the wood-fired power plant.

 

Projekt
EnBW Kraftwerke AG, Stuttgart

In the power generation plant located at Voltastrasse, STAG has implemented various pneumatic conveying systems since 1990.

Projekt
Transhipment Plant Sedrun

On behalf of Arge Transco Sedrun, STAG engineered, built and successfully commissioned, in 2003, an extraordinary transhipment plant for bulk products such as cements, ashes and microsilica necessary for the construction of the world’s longest railway t

Projekt
Cement Plant Dotternhausen

At the premises of Holcim (Süddeutschland) GmbH, STAG has implemented several projects concerning pneumatic and mechanical conveying, silo and dosing systems for different bulk products such as cement, iron oxide, hydrated lime, iron(II) sulphate, furna

Projekt
Cement Plant Kuwait

The evacuation of bypass dust from the preheater tower and the feeding into the five cement mills belong to the activities of Kuwait Cement Company KCC.

 

Projekt
WtE Ferrybridge 1

In 2013, a new waste-to-energy plant has been erected in the heart of Great-Britain, realising thus the 10th plant fitted with STAG systems and components on British soil.

Projekt
WtE Ticino, Giubiasco

In 2008, the most southern waste-to-energy power in plant in Switzerland has been put into operation.

Projekt
WtE Hagenholz (ERZ)

In the waste-to-energy power plant Hagenholz, the overall bulk material handling in the area of boiler and flue gas cleaning, ash washing as well as dry slagging has been installed by STAG.

 

Projekt
Chemiepark Salzbergen

In 2018, the existing flue gas cleaning system of the waste combustion plant SRS Ecotherm has been converted from a lime milk treatment to a conditioned dry process with hydrated lime and bicarbonate dosing.