Railwagon
Rail Wagon Equipment

More than 1400 rail wagons with customized fluidization and replacement systems for customer-specific bulk material tank rail wagons are already in operation with STAG equipment on the Indian railway net

Projekt
Transhipment Plant Sedrun

On behalf of Arge Transco Sedrun, STAG engineered, built and successfully commissioned, in 2003, an extraordinary transhipment plant for bulk products such as cements, ashes and microsilica necessary for the construction of the world’s longest railway t

Projekt
Cement Plant Dotternhausen

At the premises of Holcim (Süddeutschland) GmbH, STAG has implemented several projects concerning pneumatic and mechanical conveying, silo and dosing systems for different bulk products such as cement, iron oxide, hydrated lime, iron(II) sulphate, furna

Projekt
WtE Perlen

Based on their long cooperation in the area of conveying systems for thermal waste treatment plants, Hitachi Zosen Inova and STAG have already realised several projects together.

Product
Diverter and Shunting Pot

The STAG diverter pot constitutes a patented development in the area of pneumatic convey-ance technology, replacing the pipe bend in a series of possible applications.

News
Trade fair POWTECH

We are exhibiting at the POWTECH trade fair Powder and Bulk Solids Technology in Nuremberg. Visit us from 09.04.2019 to 11.04.2019 in hall 2 at stand 431.

Projekt
Chemiepark Salzbergen

In 2018, the existing flue gas cleaning system of the waste combustion plant SRS Ecotherm has been converted from a lime milk treatment to a conditioned dry process with hydrated lime and bicarbonate dosing.