05.08.2019
Hitachi Zosen Inova Zurich / Ivry II at Paris

Hitachi Zosen Zurich supplies for the WtE Plant Ivry II in Paris two furnace lines. For the removal of the produced bottom ash Hitachi trusts on the proven temperature-resistant STAG Chain Trough Conveyor.

With more than 300 trough chain conveyors being used successfully throughout the worldwide, STAG has gained a wide spectrum of knowledge.

The entire plant is scheduled to start operations in 2023.